Share this page |
Surfacing works have recently been done and the lines have not been repainted, how do I report this?Lines are normally relayed following resurfacing works within a specified length of time to the contractor. However the placing of lines can be determined by weather conditions.
When reporting a problem with road markings you must provide the following information:
You can report a fault with road markings by:
|