Section A - procedure for licensing scaffolding and hoardings on the highway and co-ordination with street works
Introduction
This procedure has been written in accordance with sections 169, 172 and 173 of the Highways Act 1980, sections 68 to 70 of the Traffic Management Act 2004 and Chapter 8 of the Traffic Signs Manual.
Background
We are the authority responsible for the maintenance of the public highway within North Yorkshire with the exception of trunk roads and motorways.
The Highways Act 1980 gives us the power to authorise people or companies to place certain items including skips, scaffolds, hoardings and building materials on the highway. Anyone placing these items on a highway without a licence from us is committing a criminal offence.
Under the Traffic Management Act 2004, the placing of skips, scaffolds, hoardings and building materials on the highway must be recorded by us as additional information on the street works register.
This page sets out our approach to issuing authorisation for installing scaffold and hoardings on the highway in accordance with the Highways Act 1980 and co-ordinating those works with other street works.
Registering a scaffold company
Before a company can place a scaffold or hoarding on the highway, they must be registered with us.
We will hold the company's details in an electronic register and we will record the following information:
- company name and address
- contact details including name, telephone and email information
- details of public liability insurance
- proof of competency, for example, National Scaffold accreditation body affiliation or copies of CISRS cards
We must verify the registration from the company for validity.
There is no fee for registration.
Applying to place a scaffold or hoarding within the highway
We need some basic information to grant authorisation for a scaffold or hoarding to be placed within the highway. Your application will only be considered complete when we have received all the information we ask for.
In the circumstances specified in the Highways Act 1980, an application for consent must be accompanied by a notice in the form prescribed by the regulations. This notice is defined in three parts:
- the application for the licence
- the licence itself
- notification of when the scaffolding or hoarding is removed
To help applicants, we provide these guidance notes and an application form that helps you supply all the information we need to process your application.
If we do not have all the information we need to process your application, we will contact you and explain what further information we need. We will also contact you to take payment.
Determining the application
As soon as practicable after receiving a complete application, we will decide whether to inspect the proposed scaffold or hoarding location.
We will normally process an application within three working days, unless issued need to be resolved.
If we issue a licence, we will consider whether to attach conditions to the licence. If so, we will inform you what those conditions are.
Co-ordinating with street works
We will check the dates of your application against the register of street works. Where we consider that placing a scaffold or hoarding will interfere with any current or proposed street works or road works, we will normally negotiate with you for the scaffold or hoarding to be placed on the highway on different dates.
If, for any reason, you cannot be contacted or we cannot agree a different date, we may refuse your application.
After we issue you a licence
At any time after the issue of a licence under sections 169, 172 and 173 of the Highways Act 1980, we may inspect the authorised location to check whether the conditions of the licence have been complied with.
Nothing in the terms and conditions limits us to one inspection. We may carry out further inspections at any time.
If any of the conditions of the licence are not being complied with, in accordance with the Highways Act 1980, we may either instruct you to:
- comply with the conditions
- remove or change the position of the scaffold or hoarding
Nothing in the terms and conditions prevents us taking any action we deem appropriate in the interests of highway safety, whether or not conditions of the licence are being complied with.
After your licence expires
In accordance with the Highways Act 1980, we will take action where all of the following apply:
- a licence for placing a scaffold or hoarding on the highway has expired
- the licence has not been renewed
- the scaffold or hoarding has not been removed from the permitted location
Removing scaffold or hoardings
When the scaffold or hoarding is removed from the highway, the area is to be left clean and tidy.
You are required to notify the appropriate office where your licence was issued when the scaffold or hoarding is removed.
It is an offence under section 168 of the Highways Act 1980 to carry out building operations which gives rise to risk of serious bodily injury to persons in the street - this would include the erection and dismantling of scaffolding. If convicted of this offence, the penalty is a fine not exceeding level 5 on the standard scale.
Nothing in the terms and conditions affects or limits our powers under sections 140 and 149 of the Highways Act 1980 to remove anything causing a nuisance from the highway at any time.
Section B - conditions for erecting a scaffolding or hoarding within the highway
1.1 Under sections 169, 172 and 173 of the Highways Act 1980 and sections 68 to 70 of the Traffic Management Act 2004, a licence is required to place a scaffold or hoarding on the public highway. We have the authority to issue these licences.
1.2 We may undertake a detailed visual inspection both before and after the scaffold or hoarding has been deposited and removed.
1.3 You will indemnify us against all claims, proceedings, costs and expenses arising from or in connection with any licence issued.
1.4 Public liability insurance giving minimum cover of £5 million is required. However, it may be noted that we reserve the right to increase the amounts if it is considered that the site location requires a higher degree of cover. You will be notified if this is the case and proof of increased cover will be required before the licence is granted.
1.5 You must give us three working days' notice before placing a scaffold or hoarding on a highway, unless an early start has been previously arranged. This will incur an additional fee.
1.6 Each scaffold or hoarding will be erected on the footway. Only in exceptional circumstances and with prior agreement or instructions from us will scaffold and hoardings be permitted on a carriageway or back street. Early liaison with us is advised if a scaffold is expected to be placed within 450mm of a carriageway as detailed traffic management may need to be designed and implemented or legal Traffic Regulation Orders may need to be prepared and advertised.
1.7 Where the scaffold or hoarding occupies highway space upon which there is a Traffic Regulation Order relating to charging for on-street parking, you must reimburse the relevant authority for loss of income. This may include town and parish councils. You must get an agreement with the relevant authority for this before we issue a licence. It is your responsibility to organise this and reimburse the relevant authority independently of the scaffold licence payment.
1.8 Scaffolds and hoardings will not usually be placed on a highway that has a Traffic Regulation Order restricting the parking of vehicles on that section of highway.
1.9 Traffic management issues such as the use of temporary traffic signals and temporary road closures must be discussed and agreed with us. Additional fees may apply if positive traffic management is required. We may impose extra restrictions on routes designated as traffic sensitive.
You must comply with Chapter 8 of the Traffic Signs Regulations and General Directions 2002 together with such other conditions as may be required. When carrying out work on the highway, works must be adequately signed, guarded and lit as stipulated in the Safety at Street Works and Road Works Code of Practice.
To meet the traffic management standards, personnel involved in traffic management must be trained and accredited in the “Signing, Lighting and Guarding“ module as prescribed in the New Roads and Street Work Act 1991.
For minor traffic management a company must have at least one accredited supervisor who does not have to be permanently on site.
For major traffic management, all operatives engaged in setting up the system on the highway must be Street Works Accredited in 'Signing, Lighting and Guarding.'
1.10 Nothing will be deposited in, or partly in, the carriageway of the road preventing the free passage of vehicles or pedestrians along the carriageway in at least one direction. Nor will anything prevent the free passage of pedestrians when deposited in a pedestrian precinct.
1.11 Nothing will be deposited in, or partly in, the carriage of the road preventing the free passage of vehicles or pedestrians to any premises unless the consent of the occupier of those premises has been obtained.
1.12 If a scaffold or hoarding is to be positioned in a back street, arrangements must be made to ensure the unobstructed access for refuse collection.
1.13 No scaffold or hoarding will be used in such a way that any of its contents fall on to the highway.
1.14 No scaffold or hoarding will remain on the highway pursuant to this permission after the period of the permission specified has expired.
1.15 Upon the expiration of this permission, all materials placed on each scaffold or hoarding must be properly disposed of and the highway must be left in a clean and tidy condition. We will carry out the permanent reinstatement of the disturbed highway caused by the erection or dismantling of the scaffold or hoarding and claim the costs from you. The responsibility of proof that any damage to the highway was not a result of the scaffold or hoarding operations lies with you.
1.16 Where the erection of any scaffold or hoarding would result in encasing or obscuring or would require the removal of any street furniture, for example litter bins, lighting, signing, seating or guard rails, we will undertake removal and reinstatement of the furniture and claim the costs from you.
1.17 In accordance with the Highways Act 1980, you must secure compliances with these requirements whilst the scaffold or hoarding is on the highway. If you fail to comply with these requirements, you will be guilty of an offence under section 169 of the Highways Act and liable to a fine not exceeding level 5 on the standard scale.
1.18 If a scaffold or hoarding is erected on or over the public highway for a which a licence has not been granted, the scaffold company is guilty of an offence and is liable to a fine not exceeding level 5 on the standard scale.
1.19 If ownership of the scaffold or hoarding cannot be established and is in our opinion causing a nuisance, it will be removed under the conditions of section 149 of the Highways Act 1980.
Making sure scaffolding or hoarding is visible
Chapter 8 of The Traffic Signs Manual states that where scaffolding or other type of temporary structure is erected on or adjacent to a footway, or any other part of a roadway or highway, it is essential that its presence is made clear to visually impaired people as required by the Highways Act 1980 and Chapter 43 of the Disabled Persons Act 1981.
Each tubular support should be provided with a white band, 150mm in depth, the lower edge of the band being about 1.6 metres above ground level.
Temporary close-boarded structures delineating a footway should be provided with a continuous white band of the same depth and at the same height above the ground level in the immediate vicinity.
Scaffolding and temporary structures adjacent to a footway should be lit during the hours of darkness.
Section 169 of the Highways Act 1980 requires you to adequately light the scaffold between half an hour after sunset and half an hour before sunrise. If you are convicted of an offence under this section of the act, you may be liable to a fine of up to level 3 on the standard scale.
Section 172 of the Highways Act 1980 requires you to light the hoarding during the hours of darkness. If you are convicted of an offence under this section of the act, you may be liable to a fine of up to level 3 on the standard scale.